News
Product Upgrade: Optimized High-Low Pressure Manifold Skid & Drill Floor Manifold Skid
Improved skid layout, 4130 forged HP components, stronger safety points and container-ready shipment for fracturing and wellhead choke control.
Based on overseas site feedback, we have completed upgrades for high-low pressure manifold skid and drill-floor manifold skid. Optimization highlights: improved skid frame layout for better piping arrangement; all high-pressure components 4130 integrally forged; enhanced safety protection points; suitable for full container shipment for fast onsite connection & installation.
The skid systems fit fracturing and wellhead choke control conditions. Custom layout design is available according to customer wellsite conditions. We supply complete packages including loop manifold, choke manifold, hammer unions and safety accessories.
Contact us for skid layout drawings.
